Forever Fendt
Member
- Location
- Derbyshire
1,5 ton , there’s one in each span and project out the front about 8 ft ,wire feed unit is on sliding door track so runs full length of build , ideal for structural beamsI notice you have a lifting beam down the centre of the roof. What sort of weight can you lift from that?